Case Study: 33km Fibre Subduct East Anglia

Brief

OCL were contracted to install part of 33km route of fibre subduct on the East Anglia 1 project.

 

 

Case Study: Solihul 132KV CSE Fault
Case Study: 33km Fibre Subduct